DH-Robotics PGC-300-60
DH-Robotics
Chinese manufacturer · Stock to confirm
PGC-300-60 is a electric parallel gripper. 60 mm stroke with adjustable gripping force.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 80 to 300 N
- Stroke
- 60 mm
- Recommended workpiece weight
- 6 kg
Tasks to consider
- Evaluate for controlled part gripping
- Evaluate for fixture loading
Before integration
Check finger geometry, friction, acceleration and mounting. Recommended workpiece weight is not the robot payload rating.
