All hardware

DH-Robotics PGE-8-14

DH-Robotics

Chinese manufacturer · Stock to confirm

PGE-8-14 is a electric parallel gripper. 14 mm stroke with adjustable gripping force.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
2 to 8 N
Stroke
14 mm
Recommended workpiece weight
0.1 kg

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration and mounting. Recommended workpiece weight is not the robot payload rating.

Product documentation

PGE model parameters

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.