DOBOT CR3A
DOBOT
Chinese manufacturer · Stock to confirm
CR3A is a CRA collaborative robot. 3 kg maximum payload and 620 mm working radius.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 3 kg
- Working radius
- 620 mm
- Robot weight
- 16.5 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for part presentation
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.
