All hardware

DOBOT CR7A

DOBOT

Chinese manufacturer · Stock to confirm

CR7A is a CRA collaborative robot. 7 kg maximum payload and 800 mm working radius.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Maximum payload
7 kg
Working radius
800 mm
Robot weight
24.5 kg

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for part presentation

Before integration

Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.

Product documentation

DOBOT CRA model comparison

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.