All hardware

ESTUN ER10-700-SR

ESTUN

Chinese manufacturer · Stock to confirm

ER10-700-SR is a four-axis SCARA robot. 700 mm arm length for a fixed production station.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Arm length
700 mm
Rated payload
5 kg
Maximum payload
10 kg
Axes
4

Tasks to consider

  • Evaluate for tray loading
  • Evaluate for fixture transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures and guarding before selecting the cell.

Product documentation

ESTUN SCARA product specifications

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.