ESTUN ER6-600-SR
ESTUN
Chinese manufacturer · Stock to confirm
ER6-600-SR is a four-axis SCARA robot. 600 mm arm length for a fixed production station.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Arm length
- 600 mm
- Rated payload
- 2 kg
- Maximum payload
- 6 kg
- Axes
- 4
Tasks to consider
- Evaluate for tray loading
- Evaluate for fixture transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures and guarding before selecting the cell.
