All hardware

Hai Robotics HaiPick A42

Hai Robotics · Product family

Chinese manufacturer · Stock to confirm

HaiPick A42 is a autonomous case-handling robot family. Moves totes or cartons between compatible racks and workstations.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Family picking height
Up to 6 m | 最高 6 m
Container types
Totes and cartons | 料箱及紙箱

Tasks to consider

  • Goods-to-person picking
  • Case storage and retrieval

Before integration

Confirm the exact robot configuration, rack geometry, case dimensions, floor tolerances and workstation interfaces.

Product documentation

HaiPick A42 manufacturer page

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.