All hardware

Hai Robotics HaiPick A42T

Hai Robotics · Product family

Chinese manufacturer · Stock to confirm

HaiPick A42T is a telescopic case-handling robot family. Uses a telescopic lift to access high rack positions.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Family picking height
Up to 12 m | 最高 12 m
Case payload
Up to 30 kg | 最高 30 kg

Tasks to consider

  • High-rack case retrieval
  • Tote and carton movement

Before integration

Confirm the exact robot configuration, rack geometry, case dimensions, floor tolerances and workstation interfaces.

Product documentation

HaiPick A42T manufacturer page

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.