Mech-Mind Mech-Eye NANO ULTRA-GL
Mech-Mind
Chinese manufacturer · Stock to confirm
Mech-Eye NANO ULTRA-GL is a industrial 3D camera. A 250 to 800 mm working-distance range for planning robot-guided tasks.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Working distance
- 250 to 800 mm
- Depth resolution
- 2400 × 1800
Tasks to consider
- Evaluate for part localization
- Evaluate for robot-guided picking
Before integration
Test representative parts with the proposed mounting distance, lighting and robot interface before choosing a camera.
