All hardware

Mech-Mind Mech-Eye PRO S-GL

Mech-Mind

Chinese manufacturer · Stock to confirm

Mech-Eye PRO S-GL is a industrial 3D camera. A 500 to 1000 mm working-distance range for planning robot-guided tasks.

Sourcing from Chinese manufacturers

Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Working distance
500 to 1000 mm
Depth resolution
1920 × 1200

Tasks to consider

  • Evaluate for part localization
  • Evaluate for robot-guided picking

Before integration

Test representative parts with the proposed mounting distance, lighting and robot interface before choosing a camera.

Product documentation

Mech-Eye current camera comparison

Documentation checked: 2026-10-13

Catalog inclusion does not imply authorized dealership, stock or a manufacturer partnership.