YiFan Conveyor FPR-V6
YiFan Conveyor
Chinese manufacturer · Stock to confirm
FPR-V6 is a flexible powered roller conveyor. Extends to 6000 mm for temporary package-transfer routes.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Open length
- 6000 mm
- Closed length
- 2550 mm
- Roller width options
- 600 / 800 mm
- Speed
- 10 to 20 m/min
- Maximum area load
- 100 kg/m²
Tasks to consider
- Packing-line transfer
- Loading-area package flow
Before integration
Confirm package footprint, transfer gaps, electrical supply and guarding. Keep linear and area load ratings separate.
