YiFan Conveyor FTBC-3S-4/5.4-600
YiFan Conveyor
Chinese manufacturer · Stock to confirm
FTBC-3S-4/5.4-600 is a telescopic belt conveyor. A 600 mm belt with a 9.4 m total extended length.
Sourcing from Chinese manufacturers
Discuss this equipment Stock, configuration, lead time and shipping destination require supplier confirmation. Local inventory is not listed.
Technical specifications
Manufacturer-published values. Confirm the final configuration.
- Fixed length
- 4 m
- Extension
- 5.4 m
- Total length
- 9.4 m
- Belt width
- 600 mm
- Maximum linear load
- 50 kg/m
- Supply
- 380 V, 3 phase, 50 Hz
Tasks to consider
- Container loading
- Container unloading
Before integration
Confirm package footprint, transfer gaps, electrical supply and guarding. Keep linear and area load ratings separate.
