quindart
All hardware

YiFan Conveyor FPR-V4.8

YiFan Conveyor

FPR-V4.8 is a flexible powered roller conveyor. Extends to 4800 mm for temporary package-transfer routes.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Open length
4800 mm
Closed length
2040 mm
Roller width options
600 / 800 mm
Speed
10 to 20 m/min
Maximum area load
100 kg/m²

Tasks to consider

  • Packing-line transfer
  • Loading-area package flow

Before integration

Confirm package footprint, transfer gaps, electrical supply and guarding. Keep linear and area load ratings separate.