ESTUN ER3-400-SR
ESTUN
400 mm arm length for a fixed production station.
View detailsWe help you choose, source and install the equipment your operation needs, then connect it to your existing systems. Explore genuine manufacturer hardware below.

129 listings
ESTUN
400 mm arm length for a fixed production station.
View detailsESTUN
600 mm arm length for a fixed production station.
View detailsESTUN
700 mm arm length for a fixed production station.
View detailsESTUN
800 mm arm length for a fixed production station.
View detailsDOBOT
3 kg maximum payload and 620 mm working radius.
View detailsDOBOT
5 kg maximum payload and 900 mm working radius.
View details
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.
View product documentationLet’s turn your next challenge into a system that works.
