quindart
All hardware

DH-Robotics AG-105-145

DH-Robotics

AG-105-145 is a adaptive electric gripper. 35 to 105 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
35 to 105 N
Recommended workpiece weight
2 kg
Stroke
145 mm

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.