quindart
All hardware

DH-Robotics CGI-100-170

DH-Robotics

CGI-100-170 is a centric electric gripper. 30 to 100 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
30 to 100 N
Recommended workpiece weight
1.5 kg
Recommended gripping diameter
40 to 170 mm

Tasks to consider

  • Evaluate for centering cylindrical parts
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.