DH-Robotics DH-3
DH-Robotics
DH-3 is a adaptive electric gripper. 10 to 65 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 10 to 65 N
- Recommended workpiece weight
- 1.8 kg
- Stroke
- 106 mm parallel / 122 mm centric
Tasks to consider
- Evaluate for controlled part gripping
- Evaluate for fixture loading
Before integration
Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.
