DH-Robotics RGIC-100-35
DH-Robotics
RGIC-100-35 is a electric rotary gripper. 40 to 100 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 40 to 100 N
- Recommended workpiece weight
- 1 kg
- Stroke
- 35 mm
- Rotation
- Continuous
Tasks to consider
- Evaluate for part rotation
- Evaluate for fixture positioning
Before integration
Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.
