DOBOT CR16AL
DOBOT
CR16AL is a CRA collaborative robot. 16 kg maximum payload and 1300 mm working radius. Combines a 16 kg maximum payload with reach for transfer between adjacent stations.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 16 kg
- Working radius
- 1300 mm
- Robot weight
- 40 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Check the required reach with the gripper fitted and the part in its actual orientation.
