DOBOT CR6AL
DOBOT
CR6AL is a CRA collaborative robot. 6 kg maximum payload and 1800 mm working radius. Extended reach for presenting lighter parts across a wider work area.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 6 kg
- Working radius
- 1800 mm
- Robot weight
- 41.5 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Confirm wrist loading and cycle time at the farthest pick position.
