ESTUN S5-90 Eco
ESTUN
S5-90 Eco is a six-axis collaborative robot. 5 kg published payload, 919 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 5 kg
- Reach
- 919 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Define operator recovery and record cell status.
