quindart
All hardware

ESTUN ER10B-900-MI

ESTUN

ER10B-900-MI is a 6-axis industrial robot. 10 kg published payload, 900 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
10 kg
Reach
900 mm
Axes
6

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for station-to-station transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.