ESTUN ER120-2400-PL
ESTUN
ER120-2400-PL is a four-axis palletizing robot. 120 kg published payload, 2400 mm reach and 4 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 120 kg
- Reach
- 2400 mm
- Axes
- 4
Tasks to consider
- Evaluate for pallet stacking
- Evaluate for layer transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
