ESTUN ER130-2865-BD
ESTUN
ER130-2865-BD is a 6-axis industrial robot. 130 kg published payload, 2865 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 130 kg
- Reach
- 2865 mm
- Axes
- 6
Tasks to consider
- Evaluate for press-brake handling
- Evaluate for fixture transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
