quindart
All hardware

ESTUN ER3-400-SR

ESTUN

ER3-400-SR is a four-axis SCARA robot. 400 mm arm length for a fixed production station.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Arm length
400 mm
Rated payload
1 kg
Maximum payload
3 kg
Axes
4

Tasks to consider

  • Evaluate for tray loading
  • Evaluate for fixture transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures and guarding before selecting the cell.