quindart
All hardware

ESTUN ER30B-2700

ESTUN

ER30B-2700 is a 6-axis industrial robot. 30 kg published payload, 2700 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
30 kg
Reach
2700 mm
Axes
6

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for station-to-station transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.