ESTUN ER350-3200
ESTUN
ER350-3200 is a 6-axis industrial robot. 350 kg published payload, 3200 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 350 kg
- Reach
- 3200 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
