ESTUN ER45-2200-BD
ESTUN
ER45-2200-BD is a 6-axis industrial robot. 45 kg published payload, 2200 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 45 kg
- Reach
- 2200 mm
- Axes
- 6
Tasks to consider
- Evaluate for press-brake handling
- Evaluate for fixture transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
