ESTUN ER700-2800
ESTUN
ER700-2800 is a 6-axis industrial robot. 700 kg published payload, 2800 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 700 kg
- Reach
- 2800 mm
- Axes
- 6
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
