quindart
All hardware

ESTUN ER80B-2565-BD

ESTUN

ER80B-2565-BD is a 6-axis industrial robot. 80 kg published payload, 2565 mm reach and 6 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
80 kg
Reach
2565 mm
Axes
6

Tasks to consider

  • Evaluate for press-brake handling
  • Evaluate for fixture transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.