quindart
All hardware

Mech-Mind Mech-Eye LSR L-GL

Mech-Mind

Mech-Eye LSR L-GL is a industrial 3D camera. A 1200 to 3000 mm working-distance range for planning robot-guided tasks.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Working distance
1200 to 3000 mm
Depth resolution
2048 × 1536

Tasks to consider

  • Evaluate for part localization
  • Evaluate for robot-guided picking

Before integration

Test representative parts with the proposed mounting distance, lighting and robot interface before choosing a camera.