quindart
All hardware

ESTUN ER10-800-SR-C

ESTUN

ER10-800-SR-C is a four-axis SCARA robot. 10 kg published payload, 800 mm reach and 4 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
10 kg
Reach
800 mm
Axes
4

Tasks to consider

  • Evaluate for tray loading
  • Evaluate for assembly transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.