quindart
All hardware

ESTUN ER20C-1000-SR-HI

ESTUN

ER20C-1000-SR-HI is a four-axis SCARA robot. 20 kg published payload, 1000 mm reach and 4 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Published payload
20 kg
Reach
1000 mm
Axes
4

Tasks to consider

  • Evaluate for tray loading
  • Evaluate for assembly transfer

Before integration

Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.