ESTUN ER20C-850-SR-HI
ESTUN
ER20C-850-SR-HI is a four-axis SCARA robot. 20 kg published payload, 850 mm reach and 4 axes. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Published payload
- 20 kg
- Reach
- 850 mm
- Axes
- 4
Tasks to consider
- Evaluate for tray loading
- Evaluate for assembly transfer
Before integration
Check the complete tool and part mass, wrist inertia, fixtures, guarding and machine interlocks. Connect cycle status and recovery events to the operating system.
