Hai Robotics HaiPick A42D
Hai Robotics
HaiPick A42D is a double-deep case-handling mobile robot. Retrieves totes from double-deep storage layouts.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum case load
- 50 kg
- Maximum robot load
- 300 kg
- Picking height
- 400 to 5110 mm
Tasks to consider
- Double-deep tote storage
- Goods-to-person replenishment
Before integration
Confirm the exact robot configuration, rack geometry, case dimensions, floor tolerances and workstation interfaces.
