Hai Robotics HaiPick A42T
Hai Robotics · Product family
HaiPick A42T is a telescopic case-handling robot family. Uses a telescopic lift to access high rack positions.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Family picking height
- Up to 12 m
- Case payload
- Up to 30 kg
Tasks to consider
- High-rack case retrieval
- Tote and carton movement
Before integration
Confirm the exact robot configuration, rack geometry, case dimensions, floor tolerances and workstation interfaces.
