quindart
All hardware

DOBOT CR3A

DOBOT

CR3A is a CRA collaborative robot. 3 kg maximum payload and 620 mm working radius.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Maximum payload
3 kg
Working radius
620 mm
Robot weight
16.5 kg

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for part presentation

Before integration

Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.