DOBOT CR5A
DOBOT
CR5A is a CRA collaborative robot. 5 kg maximum payload and 900 mm working radius.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 5 kg
- Working radius
- 900 mm
- Robot weight
- 25 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for part presentation
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.
