quindart
All hardware

DH-Robotics PGC-140-50

DH-Robotics

PGC-140-50 is a electric parallel gripper. 50 mm stroke with adjustable gripping force.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
40 to 140 N
Stroke
50 mm
Recommended workpiece weight
3 kg

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration and mounting. Recommended workpiece weight is not the robot payload rating.