quindart
All hardware

DH-Robotics PGC-300-60

DH-Robotics

PGC-300-60 is a electric parallel gripper. 60 mm stroke with adjustable gripping force.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
80 to 300 N
Stroke
60 mm
Recommended workpiece weight
6 kg

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration and mounting. Recommended workpiece weight is not the robot payload rating.