DH-Robotics PGE-5-26
DH-Robotics
PGE-5-26 is a electric parallel gripper. 26 mm stroke with adjustable gripping force.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 0.8 to 5 N
- Stroke
- 26 mm
- Recommended workpiece weight
- 0.1 kg
Tasks to consider
- Evaluate for controlled part gripping
- Evaluate for fixture loading
Before integration
Check finger geometry, friction, acceleration and mounting. Recommended workpiece weight is not the robot payload rating.
