quindart
All hardware

DH-Robotics PGEA-15-40

DH-Robotics

PGEA-15-40 is a electric parallel gripper. 6 to 15 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
6 to 15 N
Recommended workpiece weight
0.25 kg
Stroke
40 mm

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.