DH-Robotics PGEA-2-10
DH-Robotics

1 / 2
PGEA-2-10 is a electric parallel gripper. 0.8 to 2 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 0.8 to 2 N
- Recommended workpiece weight
- 0.05 kg
- Stroke
- 10 mm
Tasks to consider
- Evaluate for controlled part gripping
- Evaluate for fixture loading
Before integration
Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.