quindart
All hardware

DH-Robotics PGHL-400-80

DH-Robotics

PGHL-400-80 is a electric parallel gripper. 140 to 400 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
140 to 400 N
Recommended workpiece weight
8 kg
Stroke
80 mm

Tasks to consider

  • Evaluate for controlled part gripping
  • Evaluate for fixture loading

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.