quindart
All hardware

DH-Robotics RGD-5-14

DH-Robotics

RGD-5-14 is a electric rotary gripper. 2 to 5.5 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
2 to 5.5 N
Recommended workpiece weight
0.05 kg
Stroke
14 mm
Rotation
Continuous

Tasks to consider

  • Evaluate for part rotation
  • Evaluate for fixture positioning

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.