DH-Robotics RGI-100-22
DH-Robotics

1 / 2
RGI-100-22 is a electric rotary gripper. 30 to 100 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Force per jaw
- 30 to 100 N
- Recommended workpiece weight
- 1.4 kg
- Stroke
- 22 mm
- Rotation
- Continuous
Tasks to consider
- Evaluate for part rotation
- Evaluate for fixture positioning
Before integration
Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.