quindart
All hardware

DH-Robotics RGIC-35-12

DH-Robotics

RGIC-35-12 is a electric rotary gripper. 13 to 35 N adjustable force per jaw for controlled gripping. Evaluate it against the observed production constraint, part flow and recovery process before choosing equipment.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Force per jaw
13 to 35 N
Recommended workpiece weight
0.5 kg
Stroke
12 mm
Rotation
Continuous

Tasks to consider

  • Evaluate for part rotation
  • Evaluate for fixture positioning

Before integration

Check finger geometry, friction, acceleration, mounting and controller compatibility with actual parts. Recommended workpiece weight is not the robot payload rating.