DOBOT CR10A
DOBOT
CR10A is a CRA collaborative robot. 10 kg maximum payload and 1300 mm working radius.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 10 kg
- Working radius
- 1300 mm
- Robot weight
- 40 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for part presentation
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.
