DOBOT CR12A
DOBOT
CR12A is a CRA collaborative robot. 12 kg maximum payload and 1200 mm working radius. A mid-range option for machine loading and transferring fixtures or parts.
Discuss this equipmentTechnical specifications
Manufacturer-published values. Confirm the final configuration.
- Maximum payload
- 12 kg
- Working radius
- 1200 mm
- Robot weight
- 39.5 kg
Tasks to consider
- Evaluate for machine loading
- Evaluate for station-to-station transfer
Before integration
Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards. Check door opening, chuck access and machine interlocks against the complete tool envelope.
