quindart
All hardware

DOBOT CR16A

DOBOT

CR16A is a CRA collaborative robot. 16 kg maximum payload and 1000 mm working radius.

Discuss this equipment

Technical specifications

Manufacturer-published values. Confirm the final configuration.

Maximum payload
16 kg
Working radius
1000 mm
Robot weight
40 kg

Tasks to consider

  • Evaluate for machine loading
  • Evaluate for part presentation

Before integration

Include the gripper in the payload calculation. Assess the complete application before setting collaborative speeds or safeguards.